Technical Details
Type: Polyester
Cure Schedule: Metal Temperature: 12 minutes @ 400°F (204°C)
Mil Thickness: 2 – 3 mils
Green Metallic

Green Metallic
This is a great, single stage metallic Green. No clear coat needed.
Features
- Oil & Fuel Resistant Excellent exterior durability and flexibility
Swatches, Samples & Accessories
$19.10
You save
You must be logged in to see applicable discounts.
Formulated
This item is Formulated in our powder lab.
Lead Time: 1-4 Business Days
Formulated
This item is Formulated in our powder lab.
Lead Time: 1-4 Business Days


